Home
About Us
Product Catalog
Back Up Service
Trade Leads
Contact Us
Product Catalog
 
Mini-Related Sign Products > Automatic Hot Air Welder for banner/ Leister heater gun
click for larger photo
	Automatic Hot Air Welder for banner/ Leister heater gun
Automatic Hot Air Welder for banner/ Leister heater gun
Name︰ Automatic Hot Air Welder for banner/ Leister heater gun
Brand Name︰DIGIO
Country of Origin︰China
Product Description
www.sinoprintek.com

Automatic Hot Air Welder for banner/ Leister heater gun

Automatic Hot Air Welder

USER MANUAL

 

1. Introduction:

Thank you very much for choosing our "Automatic Mini-Hot Air Welder". We believe that this will be your best choice for your business. This equipment is designed professionally for seaming PE, PVC and painting banners.

To help you understand the characters and features of this equipment and know how to operate safely and keep in good condition etc...We give you THE MANUAL OF INSTRUCTIONS for your reference. Although the machine is produced well and passed the strict quality examination in our factory before we deliver the machine to you, the effects of the function will be absolutely caused by the improper operation or without complete maintenance. For the reason of safety and the excellent performance of the machine, please read and follow the directions before operation. Please keep in mind that all the danger would be caused by carelessness and not reading the manual carefully.

2. General instructions for safety:

Warning: The basic principal of safe protection should be followed usually to reduce in danger of fire disaster, electric shock and personal harm. Please pay attention to the following carefully without neglectfulness before operation.

1. Keep the working place clean usually. Messing up and the disorderly working place cause disaster
2. Choose the work place carefully and use the machine in a bright and dry environment.
3. The electricity, controlling box and protective facilities have to be in the proper order after finish daily work. The electrical power has to be switched off definitely.
4. The machine has to be stopped before gets maintenance or replacing the parts.
5. Use standard or indicated tools when dismantle or replace parts.
6. For safety and the long life of the machine, please do not let the machine operates overtime.
7. If any special incidents happen, please stop the machine first for repairing. Please do not handle the special incident with improper procedures.
8. If the machine is operated on land, keep the work place clean and make sure no dust there. If dust or something blocks the inhaling filter of heater, the heating wind can not come out adequately and then temperature inside of filter will rise to let the heater burn down.

3. Moving, Dismantlement, Installation, Cleaning:

1. Any part of this machine being bumped or fallen can cause some damage impossible to be repaired. So please pay attention to carry it. It is suggested to move the machine by manpower and put it down carefully.
2. Please check if there is damage or missed parts after unpack the machine. Any problem, please contact us or the local agent immediately.
3. The place for installation must be flat and the floor is strong enough to support the machine and moreover, the installation place should close to power supply.
4. Keep the installation place no dust and avoiding sunshine.
5. Please sweep away the anti-rust oil from the machine with detergent and re-lubricate with light lubricating oil after installation.

4. Connecting the power supply:

Connecting the electric wire to the reserved plug (AC220V) of controlling box

5. Operation:

1. Make the cloth for seaming flat and put it underneath. Fix both ends by adhesive tape or something else.
2. The overlap width of the two pieces is about 30mm, the width of the nozzle of hot seaming machine.
3. Put the machine nozzle between two overlap pieces. The press-wheel should be at left side of nozzle. The nozzle also need align with side of upper piece of cloth.
4. Switch on the motor power and then adjust speed.
5. Turn on the movement switch.
6. Press heating power key to adjust temperature.
7. Turn the bar by anticlockwise to fix the position to startup automatic movement. The machine will go along with the overlap path by itself.
8. Turn the bar by clockwise to cease the automatic work.
9. The operator should control the moving direction and make sure the nozzle connect both with upper and under piece of cloth.

6. Notice:

1. During operating, if the surface cloth is dissolved and scorched or the cloth are not sticked together, please stop to adjust the temperature or speed.
2. During operating, if the seaming part is not in right position, please stop to adjust fixing position.
3. During operating, make sure clothes are flat so that stick together smoothly.
4. The hot wind of heater cannot touch the press-wheel or the rubber of press-wheel is easy to be burned down.
5. Adjust temperature to zero before turn off the heater. Switch off after 5-10 minutes.

7. Maintenance:

1. Take care of the nozzle of heater. Use brush to clear off if there is any dust or block in the nozzle or filter.
 

One fully year part warranty is included exclude heater gun.

ETA 5-7 business days.
Product Image
	Automatic Hot Air Welder for banner/ Leister heater gun
Related Products
Auto/manual Cold Laminator
Auto/manual Cold Laminator
Banner Welder
Banner Welder
Flame Polisher/Acrylic polisher
Flame Polisher/Acrylic polisher
Automatic Grommet Machine
Automatic Grommet Machine